Methodology for Improvement Capacity Installed in a Production Line of Salted Peanuts

Authors

DOI:

https://doi.org/10.36790/epistemus.v15i31.165

Keywords:

Installed Capacity, Peanuts, Cost Analysis, SIPOC

Abstract

The project focuses on the production capacity analysis in a company that produces salty peanut botanero which currently carries out its activities in a non-industrialized way, omitting the adequate standardization, so it is affected by the demand or the projected objectives in the local market. According mentioned and based on its growth and planned demand for the next 5 years, a proposal is prepared in order to meet that objective. The installed capacity could supply 67,410 pieces annually when sales of more than 158,760 pieces were forecast. The comparative analysis carried out between two alternatives related to the acquisition of new machinery or hiring of operators to increase the workforce, to the production area.

Downloads

Download data is not yet available.

References

C. M. Toda Ribes, Estudio del procedimiento del análisis de mejora de una fábrica con una producción en continuo, Projecte Final de Màster Oficial, UPC, Escola Tècnica Superior d'Enginyeria Industrial de Barcelona, Departament d'Organització d'Empreses, 2020.

Cuatrecasas, Lluís. Lean management. Editorial Profit, 2010.

Egle Klumbyte, Raimondas Bliudzius2 and Paris Foikades, A SIPOC based model for the sustainable management of facilities social housing, IOP Conference Series: Earth and Environmental Science, Volume 410, 2019. DOI: https://doi.org/10.1088/1755-1315/410/1/012081

Maier, D., Sven-Joachim, I., Fortmuller, A. and Maier, A, Development and Operationalization of a Model of Innovation Management System as Part of an Integrated Quality, Environment Safety System. Amfiteatru Economic journal. Editura vol.19, 2017.

Vivanco Vergara, M. E. Los manuales de procedimientos como herramientas de control interno de una organizació, Universidad y Sociedad, 9(2), 2017.

Mundaca Fernando, Saldarriaga Miguel, Virreira Cesar, Utilización de la capacidad instalada, BCRP. Revista Moneda, 179-04, 2019.

Baca Urbina, Gabriel. Fundamentos de ingeniería económica. 2010.

Aguilera Díaz A. El costo-beneficio como herramienta de decisión en la inversión en actividades científicas. Cofin Habana 11.2, 2017.

Whitman, David L., and Ronald E. Terry. Fundamentals of engineering economics and decision analysis. Synthesis Lectures on Engineering 7.1, 2010. DOI: https://doi.org/10.2200/S00410ED1V01Y201203ENG018

Arcentales Hidalgo, Cristhian Leonardo. Valuación de un proyecto a través del valor actual neto (VAN) y tasa interna de retorno (TIR), 2020.

Mishra, P., & Sharma, R. K. A hybrid framework based on SIPOC and Six Sigma DMAIC for improving process dimensions in supply chain network. International Journal of Quality & Reliability Management, 2014. DOI: https://doi.org/10.1108/IJQRM-06-2012-0089

Ana, Gavriluță. Analysis of a production system with the help of lean manufacturing tools." TEHNOMUS-New Technologies and Products in Machine Manufacturing Technologies, 2017.

Published

2022-01-21

How to Cite

Granich, G., & Anaya Pérez, M. E. (2022). Methodology for Improvement Capacity Installed in a Production Line of Salted Peanuts. EPISTEMUS, 15(31), 87–94. https://doi.org/10.36790/epistemus.v15i31.165

Issue

Section

Science Technology and Society

Metrics

Similar Articles

<< < 11 12 13 

You may also start an advanced similarity search for this article.