Desing of a PMO based on PMI applied in a Chilean university

Authors

  • Esteban Toledo Pérez de Arce Universidad Católica del Norte
  • Luis Alvarado Acuña Universidad Católica del Norte
  • Jocelyn Castillo Vega Universidad Católica del Norte
  • Rocio Veas Mercado Universidad Católica del Norte

DOI:

https://doi.org/10.36790/epistemus.v12i25.86

Keywords:

PMO, Intellectual Capital Management, Strategic Management, Organizational Maturity Models in Project Management, Portfolio Management and Programs Management, Portfolio Management, Programs Management

Abstract

This article synthesizes the design of a PMO based on the PMI standard for project management. Firstly, an adaptation of the strategic plan for the Vallenar Headquarters is made, and then, using the organizational maturity model, it is possible to recommend an appropriate PMO to be designed, which aims to improve the practices in the direction of projects by generating consulting initiatives, training and support to the members of the organization to initially reach a level of common language in project management. To carry out this task, the design of the PMO is based on the implementation of the organizational strategy through portfolio management, aligning the projects with the institutional strategy and the materialization of the organizational policies through the management of programs that will group the projects generated in the Vallenar Headquarters of the University of Atacama. Finally, the result is a level of maturity below level 1, recommending...

Downloads

Download data is not yet available.

References

Alvarado, L. (2004). Gestión estratégica en el siglo XXI. Antofagasta, Chile: Universidad Católica del Norte

Kerzner, H. (2001). Strategic planning for Project management using a project management naturity model.United States of America: Jhon Wiley & Sons, Inc.

Kerzner, H. (2003). Strategic Planning For A Project Office. Project Management Journal, 2(34), 13-25 DOI: https://doi.org/10.1177/875697280303400203

Nonaka, I., & Takeuchi, H. (1995). The Knowledge-creating Company: How Japanese Companies Create the Dynamics of Innovation. (O. U. Press, Ed.) DOI: https://doi.org/10.1016/0024-6301(96)81509-3

Porter, M. (1985). The Competitive Advantage: Creating and Sustaininng Superior Performance. NY: Free Press.

Project Management Institute. (2017). Fundamentos para la dirección de proyectos (Guía PMBOK).

Newtown Square, Pensilvania EE.UU: Project Management Institute, Inc.

Schlichter, J. (1999). Surveying Project Management Capabilities. PM Network, 4(13), 39–40.

Shaw, E. (1999). A guide to the qualitative research process: evidence from a small firm study. Qualitative Market Research: An International Journal, 2(2), 59-70 DOI: https://doi.org/10.1108/13522759910269973

Toledo Perez de Arce, E. (2017). Diseño de una PMO basada en el estándar PMI para la gestión de proyectos en la sede Vallenar de la Universidad de Atacama, Chile. (Tesis para optar al grado de Magister en Gestión Integral de Proyectos). Universidad Católica del Norte.

Universidad de Atacama. (2007). Modelo Educativo de la Universidad de Atacama. Copiapó.

Universidad de Atacama Dirección de Planificación. (2014). Plan de Desarrollo Estratégico 2015-2019. Copiapó.

Yin, R. K. (1994). Case study research: design and methods.Thousand Oaks, London, New Delhi : Sage Publications, 1994.

Yin, R. K. (2003). Case Study Research: Design and Methods(Third Edition ed.). Sage, 2003

Published

2018-12-31

How to Cite

Toledo Pérez de Arce, E., Alvarado Acuña, L., Castillo Vega, C. V., & Veas Mercado, R. (2018). Desing of a PMO based on PMI applied in a Chilean university. EPISTEMUS, 12(25), 64–75. https://doi.org/10.36790/epistemus.v12i25.86

Metrics

Similar Articles

<< < 3 4 5 6 7 > >> 

You may also start an advanced similarity search for this article.